Hitachi Zosen Inova will supply two new lines at Schwandorf waste-to-energy plant
Hitachi Zosen Inova (HZI) is supplying two new lines for the Schwandorf waste-to-energy plant.
The contract has just been signed by Hitachi Zosen Inova Steinmüller (HZI-STM), Gummersbach with Zweckverband Müllverwertung Schwandorf (ZMS), the local special-purpose association responsible for waste management.
As part of the contract, three of the four existing lines of the waste-to-energy plant will be dismantled by ZMS and replaced by HZI with two larger, state-of-the-art lines.
The contract for the EPC turnkey project covers the combustion system and boiler, the flue gas treatment unit, the technical building equipment, EMCR and associated technology, structural engineering and the necessary connections to the existing installations, relocation and temporary arrangements for each line.
Top image: ©Silke Reents
Other members news

Welcome to ESWET’s 44th member
09.09.2025ME-Automation Projects GmbH (MEAG) is ESWET’s 44th and latest member. The company, a subsidiary of Mitsubishi Electric Corporation, specialises in automation…

A new member joins the ESWET family
02.09.2025We are excited to announce that Wasteer has joined ESWET as the association’s newest member. Wasteer employs AI computing to…

LAB and MARTIN go to Canada
17.07.2025ESWET members LAB and MARTIN GmbH will work on a new Waste-to-Energy (WtE) plant in Charlottetown, Prince Edward Island, Canada….