Inova
09.09.2013
Inova awarded the retrofit of Annecy Waste-to-Energy plant.[nbsp]The two 7.25 t/h incineration lines will allow a CHP energy recovery, through two 14.8 MWth boilers and a 9.5 MWe steam turbogenerator.
Inova awarded the retrofit of Annecy Waste-to-Energy plant.[nbsp]The two 7.25 t/h incineration lines will allow a CHP energy recovery, through two 14.8 MWth boilers and a 9.5 MWe steam turbogenerator.
Industry data suggest that every ton of Incinerator Bottom Ash (IBA) can contain up to 10–15% recoverable metals. Despite this…
MARTIN GmbH and LAB won a contract to help renovate the SAKO Waste-to-Energy plant in Brno, Czech Republic. The ESWET…
P-WAVE has joined ESWET has our association’s newest member. P-WAVE is an engineering company specialising in innovative boiler-cleaning technologies. Founded…